Wastewater Treatment Plant

Austin Beckman, Waste Water Plant Operator
Chris Engberg
Waste Water Plant
Operator
Jarod Barclay
Chief Waste Water Plant Operator

Opened in 2016 the Brookfield Wastewater Plant was constructed to comply with state and federal wastewater discharge standards, meet the changing needs of the community, and reflect the city’s efforts to protect streams and groundwater in the area. Designed to process 1 mission gallons of wastewater a day and operate 24 hrs a day 7 days a week using what is known as an Activated Sludge Process. The plant performs 4 main functions:

  • Remove solids such as plastics and paper
  • Reduce organic matter and pollutants using naturally occurring beneficial bacteria
  • Disinfect using UV radiation to deactivate pathogens
  • Restore oxygen to ensure the water returned to our waterways has enough oxygen to support life

Click here to view the 2020 Annual Water Quality Report. This report is intended to provide you with important information about your drinking water and the efforts made to provide safe drinking water.